21 Jul 2016

Energy Audits in FLOWSERVE, ZITRON, MUTUA UNIVERSAL and URSA

KeelWit Technology has been performing energy audits in factories and buildings since 2012.  Since the RD 56/2016 was published, forcing big companies to perform an energy audit before November 2016, this activity has been enhanced. In the last months we have been working on the audits of: Over 80 offices and care centers of Mutua Universal spread all over Spain Zitrón’s fan and mining equipment factory in Asturias Flowserve’s hydraulic pump factory in Coslada URSA’s glass wool factory in Tarragona. The final audit reports shall be registered following the RD 56/2016 requirements but shall also become the guidelines for an emission and energy consumption reduction in these companies during the following 4 years.  ...
10 Apr 2015

Fans designed for Madrid Fly’s vertical wind tunnel succesfully tested

On April 10th, the first of the 4 fans for skydiving purposes jointly designed by KeelWit and Zitron was tested in the biggest test bench for axial fans in the world. With a size over 4m diameter and a weight exceeding 10 tons each, they shall deliver the needed power to propel skydivers at a speed of 300 km/h. Energy efficiency, acceleration speed and airflow quality have been some of the development guidelines followed by both engineering teams. These fans shall be installed in a very short time in Madrid Fly’s wind tunnel, where the construction of the building that shall host all the technical equipment and devices designed by KeelWit Technology, has just...
Logo Keelwit
Logo ENISA
Síguenos LinkedIn
KeelWit Robust & Dreamlike Technology